• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Genesis Concrete

Genesis Concrete

Turnkey Concrete Solutions

  • Home
  • About Us
  • Projects
  • Services
  • Gallery
  • Contact Us
  • Call us: +1-904-406-8443
  • Call us: +1-904-406-8443

Gallery

19
1
Orlando Health Project
15
0

Orlando Health Project

17
0

Orlando Health Project

Foundations going in for a new student housing project in Gainesville, Fl.
15
0

Foundations going in for a new student housing project in Gainesville, Fl.

20
2

N4 Gateway Jax shot by @droneguyjax

N4 Gateway Jax shot by @droneguyjax
7
3

N4 Gateway Jax shot by @droneguyjax

N4 Gateway Jax shot by @droneguyjax
5
2

N4 Gateway Jax shot by @droneguyjax

N4 Gateway Jax shot by @droneguyjax
7
3

N4 Gateway Jax shot by @droneguyjax

N4 Gateway Jax shot by @droneguyjax
3
1

N4 Gateway Jax shot by @droneguyjax

City of Jacksonville Riverfront Plaza shot by @droneguyjax
12
1

City of Jacksonville Riverfront Plaza shot by @droneguyjax

City of Jacksonville Riverfront Plaza shot by @droneguyjax
6
1

City of Jacksonville Riverfront Plaza shot by @droneguyjax

City of Jacksonville Riverfront Plaza shot by @droneguyjax
5
0

City of Jacksonville Riverfront Plaza shot by @droneguyjax

N11 Pearl St. Gateway Jax
6
0

N11 Pearl St. Gateway Jax

9
0

N11 shot by @droneguyjax

8
0

N11 Gateway Jax

Riverfront Plaza specialty project. This consisted of architectural cast in place columns, walls  and elevated  slabs. Also, Multiple different elevations in the site, strict radius and sloping slabs.
7
0

Riverfront Plaza specialty project. This consisted of architectural cast in place columns, walls and elevated...

8
0

N11 pool and courtyard on level 2

N11 progress pictures
7
0

N11 progress pictures

6
0

One Riverside residences. This project was a multi level CIP concrete podium along with a...

7
0

UNF Honors student housing. Turnkey concrete package consisted of 4 separate buildings with 4 levels...

Form work for the sloping cantilevered slab.
11
1

Form work for the sloping cantilevered slab.

Images of the poured in place architecturally radiused concrete walls and columns. Sloped structural concrete slabs will sit on top.
5
0

Images of the poured in place architecturally radiused concrete walls and columns. Sloped structural concrete...

Podium deck and columns for multi family apartment project in Palm Bay, Florida.
7
0

Podium deck and columns for multi family apartment project in Palm Bay, Florida.

Elevated Podium slab pours for an apartment project in Orlando,Florida.
6
0

Elevated Podium slab pours for an apartment project in Orlando,Florida.

Bank of America parking garage. 385,000 SF. Foundations, concrete walls, colums, slabs and topping slabs
6
0

Bank of America parking garage. 385,000 SF. Foundations, concrete walls, colums, slabs and topping slabs...

Residence Inn Hotel project. Performed the turn key concrete scope on this 7 level hotel.
4
0

Residence Inn Hotel project. Performed the turn key concrete scope on this 7 level hotel....

6
0

Student dormitory project with thin brick form liner cast into the panels

Grove Senior living in Clearwater,Florida
2
0

Grove Senior living in Clearwater,Florida

VA Medical center Jacksonville,Florida
3
0

VA Medical center Jacksonville,Florida

Sandlake Apartments and Garage in Orlando, Florida.
4
0

Sandlake Apartments and Garage in Orlando, Florida.

One Riverside Apartments and Garage in Jacksonville, Florida
2
0

One Riverside Apartments and Garage in Jacksonville, Florida

The Grand Apartments and Garage in Orlando, Florida.
4
0

The Grand Apartments and Garage in Orlando, Florida.

Apartment project in Orlando. Working on cast in place concrete columns, walls and slabs.
2
1

Apartment project in Orlando. Working on cast in place concrete columns, walls and slabs.

Progress in Riverside. Currently working on concrete columns and walls for buildings 1000,2000 and garage.
5
2

Progress in Riverside. Currently working on concrete columns and walls for buildings 1000,2000 and garage....

Hotel project on the beach.
3
0

Hotel project on the beach.

5
0

Cast in place concrete walls for a new hospital project. Over 600 LF of 20...

Distribution center project. 210,000 SF of flatwork. Each pour consisting of 500 cubic yards.
6
0

Distribution center project. 210,000 SF of flatwork. Each pour consisting of 500 cubic yards.

3
0

Shoring being set for a 24” thick cast in place slab.

Part of the specialty form work on the cast in place concrete columns and walls for the missile hangars
7
1

Part of the specialty form work on the cast in place concrete columns and walls...

Complete concrete package for a new office structure. Scope features 3 cast in place concrete shear wall towers, structural podium slab, concrete columns and cast in place structural stairs.
2
0

Complete concrete package for a new office structure. Scope features 3 cast in place concrete...

Poured the 24” podium slab at the end of august to top off project 931. Swipe right to see a time lapse video of how we got here. #concreteconstruction
2
0

Poured the 24” podium slab at the end of august to top off project 931....

Saturday morning’s podium slab pour. 900 cubic yards of concrete went into this 24” thick floor slab and 7ft tall pool walls and beams.
6
0

Saturday morning’s podium slab pour. 900 cubic yards of concrete went into this 24” thick...

Office building project including 40,000 square feet of concrete slab on metal deck.
6
0

Office building project including 40,000 square feet of concrete slab on metal deck.

Senior Living project with 16,000 linear feet of grade beam along with a 70,000 square foot post-tensioned slab on grade.
1
0

Senior Living project with 16,000 linear feet of grade beam along with a 70,000 square...

Mat slab completed for a new missile hangar on a military base. Over 225 tons of rebar on this project. Next up are the cast in place concrete walls, columns and structural slab. #concreteconstruction
4
0

Mat slab completed for a new missile hangar on a military base. Over 225 tons...

Ashley square in downtown Jacksonville. Turnkey Scope includes 70,000 SF of multi-level podium slab, pile caps, shear walls and columns. #concreteconstruction
6
0

Ashley square in downtown Jacksonville. Turnkey Scope includes 70,000 SF of multi-level podium slab, pile...

Gator walk student housing nearing completion with the final slab on grade pour. This projects turnkey package Includes 35,000 SF podium slab, concrete shear walls, columns and beams. #concreteconstruction
7
0

Gator walk student housing nearing completion with the final slab on grade pour. This projects...

Progress at our turn key student housing project rising at the University of Florida. Over 100,000 SF of podium slab and ramps being installed along with concrete shear walls and columns #concreteconstruction
5
0

Progress at our turn key student housing project rising at the University of Florida. Over...

Florida Blue Parking Garage 80,000 sf #concreteconstruction #concretelife
3
0

Florida Blue Parking Garage 80,000 sf #concreteconstruction #concretelife

6 story hotel for Residence Inn by Marriott #concreteconstruction #concretelife
3
0

6 story hotel for Residence Inn by Marriott #concreteconstruction #concretelife

Footer

GENESIS-1

CONTACT

CALL 904-406-8443

11555 Central PKWY – Suite 204
Jacksonville, FL 32224

richard@genesisconcretestructures.com

EXPLORE

  • Home
  • About Us
  • Projects
  • Services
  • Gallery
  • Contact Us

© 2026. Genesis Concrete LLC. All Rights Reserved.. Website powered by anologix. Privacy Policy | Terms of use | Back to top